Requirements 009: Layered capability_limited Participant Restrictions

Based on: - doc/project/40-proposals/018-layered-capability-limited-participant-restrictions.md - doc/project/40-proposals/014-node-transport-and-discovery-mvp.md - doc/project/50-requirements/requirements-006.md - doc/normative/30-core-values/CORE-VALUES.md - doc/normative/50-constitutional-ops/UNIVERSAL-BASIC-COMPUTE.md

Date: 2026-03-29 Status: Draft (participant restriction baseline)

Executive Summary

This document defines the first implementation-facing requirements for participant-scoped layered restriction state under the frozen capability_limited label.

The MVP baseline must support:

  • always-on soft degradation factors,
  • optional hard blocked operations,
  • explicit authorship and expiry for hard blocks,
  • a protected non-blockable floor,
  • and the first narrow Node enforcement hooks.

Context and Problem Statement

Transport already has a peer-quality downgrade path. What it does not yet have is one canonical participant-facing restriction artifact that can:

  • narrow privileged operations without cutting the participant off from the network,
  • keep soft and hard effects separate,
  • anchor hard restrictions in a named authority and review basis,
  • and keep sanctions bounded in time.

Without this contract, sanction behavior remains partly implicit and partly mixed into peer state that was never meant to carry all operation-level semantics.

Proposed Model / Decision

Canonical Artifact

The canonical MVP artifact family is:

  • participant-capability-limits.v1

The artifact is participant-scoped and freezes:

  • status = capability_limited
  • mandatory soft.priority-factor
  • mandatory soft.rate-limit-factor
  • optional hard.blocked-operations
  • optional hard.reason/ref
  • optional hard.decision/author
  • optional hard.expires-at

Protected Floor

The MVP baseline treats the following operations as non-blockable through this artifact:

  • core/messaging
  • keepalive
  • dispute/file
  • ubc/claim
  • signal-marker/send

First Runtime Hooks

The first Node rollout should:

  • reject procurement/request when hard-blocked,
  • reject procurement/offer when hard-blocked,
  • preserve signal-marker/send as an explicitly allowed path,
  • consume soft.priority-factor as a procurement-ranking penalty,
  • and consume soft.rate-limit-factor through a deterministic per-participant cooldown on the first admitted daemon operations.

Broader governor policies remain later work, but the field itself is no longer paper-only.

Functional Requirements

ID Requirement Type Source
FR-001 The system MUST support a canonical participant restriction artifact participant-capability-limits.v1. Fact Proposal 018
FR-002 participant-capability-limits.v1 MUST be participant-scoped and require canonical participant/id = participant:did:key:.... Fact Proposal 018
FR-003 The artifact MUST freeze exactly one MVP state label: status = capability_limited. Fact Proposal 018
FR-004 The artifact MUST require a soft layer with priority-factor and rate-limit-factor, each normalized to (0.0, 1.0]. Fact Proposal 018
FR-005 The artifact MAY carry a hard layer, but if present it MUST require non-empty blocked-operations, reason/ref, decision/author, and expires-at. Fact Proposal 018
FR-006 decision/author in the hard layer MUST be an accountable canonical subject id in MVP; at minimum participant:did:key:..., org:did:key:..., and council:did:key:... MUST be admitted. Fact Proposal 018
FR-007 hard.blocked-operations MUST remain an open operation namespace rather than a closed enum of transport capabilities. Fact Proposal 018
FR-008 hard.blocked-operations MUST NOT admit core/messaging, keepalive, dispute/file, ubc/claim, or signal-marker/send. Fact Proposal 018
FR-009 The first Node runtime enforcement MUST reject procurement/request when the asking participant carries an active hard block for that operation. Fact Proposal 018
FR-010 The first Node runtime enforcement MUST reject procurement/offer when the responder participant carries an active hard block for that operation. Fact Proposal 018
FR-010a The first expanded Node runtime enforcement MUST reject response/deliver when the responding participant carries an active hard block for that operation. Fact Proposal 018
FR-010b The first expanded Node runtime enforcement MUST reject procurement/contract-accept when the asking participant carries an active hard block for that operation. Fact Proposal 018
FR-010c The first expanded Node runtime enforcement MUST reject response/accept when the asking participant carries an active hard block for that operation. Fact Proposal 018
FR-010d The first expanded Node runtime enforcement MUST reject response/reject when the asking participant carries an active hard block for that operation. Fact Proposal 018
FR-011 The first Node runtime enforcement MUST keep signal-marker/send admissible even when the participant is otherwise capability_limited. Fact Proposal 018
FR-012 The first Node runtime SHOULD consume soft.priority-factor as a deterministic procurement-ranking penalty rather than ignoring the soft layer completely. Fact Proposal 018
FR-013 The first Node runtime MUST consume soft.rate-limit-factor through a deterministic per-participant operation cooldown for the first admitted daemon operations. Fact Proposal 018
FR-014 The first admitted daemon operation set for the generic cooldown hook MUST include at least procurement/request, procurement/offer, procurement/contract-accept, response/deliver, response/accept, response/reject, and signal-marker/send. Fact Proposal 018
FR-015 Participant restriction state MUST complement rather than replace transport-facing peer governor state. Fact Proposal 018 + Proposal 014
FR-016 Runtime traces and operator-visible diagnostics SHOULD make it possible to distinguish blocked privileged operations from protected floor operations and from cooldown rejections. Inference Proposal 018 + project values
FR-017 Participant-side response/accept and response/reject MUST be exposed through a participant-scoped daemon control contract rather than through infrastructure-operator action endpoints. Fact Proposal 018

Non-Functional Requirements

ID Requirement Type Source
NFR-001 Hard restrictions MUST stay time-bounded in MVP; sanction artifacts without expiry are inadmissible. Fact Proposal 018
NFR-002 The restriction artifact SHOULD remain small, append-only in spirit, and auditable without requiring a full governance subsystem rewrite. Inference Proposal 018 + project values
NFR-003 Operation-level sanction semantics MUST stay separate from transport handshake capability semantics. Fact Proposal 018
NFR-004 The protected floor MUST preserve minimum dignity, communication, and appeal paths even when privileged operations are curtailed. Fact Proposal 018 + UBC + core values
NFR-005 Soft degradation factors SHOULD be stable enough for deterministic ranking and later throttling, rather than host-local folklore. Fact Proposal 018

Failure Modes and Mitigations

Failure Mode Impact Mitigation
Transport peer downgrade is mistaken for participant sanction Layer confusion and wrong enforcement target Keep participant restriction in its own artifact and preserve peer governor as a separate layer.
A hard restriction blocks communication or appeal De facto exile under a lighter procedure Freeze a protected non-blockable floor and reject such artifacts at schema level.
Sanction author is implicit or anonymous Accountability dissolves into process folklore Require decision/author and reason/ref on every hard block.
Hard restriction never expires Temporary measure becomes silent ban Require expires-at for every hard block.
Runtime ignores soft factors entirely capability_limited becomes a paper state with no practical effect Require both a ranking penalty and a deterministic cooldown hook in the first Node rollout.

Open Questions

  1. When should rate-limit-factor become a generic throttle hook beyond procurement?
  2. Should the initial cooldown grain stay at (participant, operation) or later move toward (participant, operation, question) for concurrent contracts?
  3. Should a later rollout add a sibling org-scoped restriction artifact or generalize this one to subject/kind?
  4. Which blocked operations should be elevated into a more formal registry first?
  5. Which review or case artifact should become the long-term normative companion of this restriction record?

Next Actions

  1. Sync participant-capability-limits.v1 into the Node protocol contract mirror.
  2. Add Node-side import validation for the new artifact.
  3. Wire the first procurement and messaging hooks against it.
  4. Keep launcher-facing participant decision flows on a distinct control surface from operator actions.
  5. Revisit generic throttling after the operation-facing governor grows beyond the first MVP hooks.